Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2003
Principal Product Automotive Air Conditioner Clutch Assemblies
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 90,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 4,750
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,892 4,826,080 kWh $0.02
Electricity Demand $174,262 9,698 kW-months/year $17.97
Electricity Fees $20,200 - $ -
TOTAL ENERGY COSTS $304,354
RECOMMENDED SAVINGS* $85,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,076
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,492
Cost:
$5,655
$1,238 54,350 $2,254 126 - - - - $1,238
54,350
kWh
$2,254
126
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$42,683
Cost:
$2,100
$20,509 900,743 $22,174 1,234 - - - - $20,509
900,743
kWh
$22,174
1,234
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,416
Cost:
$10,600
$2,254 99,000 $7,116 396 $(-2,954) (-422) - - $2,254
99,000
kWh
$7,116
396
kW-months/year
$(-2,954)
(-422)
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,706
Cost:
$1,660
$1,222 53,690 $3,864 215 - - $620 - $1,222
53,690
kWh
$3,864
215
kW-months/year
-
-
MMBtu
$620
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,693
Cost:
$1,000
- - $13,693 762 - - - - -
-
kWh
$13,693
762
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$13,700
Cost:
$6,480
$5,290 232,315 $8,410 468 - - - - $5,290
232,315
kWh
$8,410
468
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$85,690
Cost:
$27,495
$30,513 1,340,098 $57,511 3,201 $(-2,954) (-422) $620 - $30,513
1,340,098
kWh
$57,511
3,201
kW-months/year
$(-2,954)
(-422)
MMBtu
$620
-
$
TOTAL IMPLEMENTED Savings:
$70,076
Cost:
$9,580
$25,799 1,133,058 $44,277 2,464 - - - - $25,799
1,133,058
kWh
$44,277
2,464
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes