IAC Assessment: UM0234
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0234
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2003
Principal Product Heat Treatment Services to Customer's Parts
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 100,000
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,068 14,843,560 kWh $0.01
Electricity Demand $276,632 15,213 kW-months/year $18.18
Electricity Fees $23,856 - $ -
Natural Gas $1,062,546 286,842 MMBtu $3.70
TOTAL ENERGY COSTS $1,554,102
RECOMMENDED SAVINGS* $128,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,503
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$71,900
Cost:
$180,000
- - - - $71,900 19,425 -
-
kWh
-
-
kW-months/year
$71,900
19,425
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$27,488
Cost:
$360
- - $27,488 1,512 - - -
-
kWh
$27,488
1,512
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,415
Cost:
$2,925
$2,525 196,231 $4,890 269 - - $2,525
196,231
kWh
$4,890
269
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,603
Cost:
$120,000
$3,604 280,055 $6,999 385 - - $3,604
280,055
kWh
$6,999
385
kW-months/year
-
-
MMBtu
05: 2.2514 COVER OPEN TANKS Savings:
$8,523
Cost:
$2,000
- - - - $8,523 2,304 -
-
kWh
-
-
kW-months/year
$8,523
2,304
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,198
Cost:
$5,219
$307 23,844 $1,891 104 - - $307
23,844
kWh
$1,891
104
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$128,127
Cost:
$310,504
$6,436 500,130 $41,268 2,270 $80,423 21,729 $6,436
500,130
kWh
$41,268
2,270
kW-months/year
$80,423
21,729
MMBtu
TOTAL IMPLEMENTED Savings:
$82,503
Cost:
$300,000
$3,604 280,055 $6,999 385 $71,900 19,425 $3,604
280,055
kWh
$6,999
385
kW-months/year
$71,900
19,425
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas