IAC logo
IAC Assessment: UM0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2003
Principal Product Commercial/Residential Hardware, Small Engine Components, Automotive, Ga
NAICS 331523 - Nonferrous Metal Die-Casting Foundries
SIC 3364 - Nonferrous Die-casting Exc. Aluminum
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 115,000
Annual Production 15,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,668 8,539,200 kWh $0.03
Electricity Demand $168,020 17,136 kW-months/year $9.81
Electricity Fees $32,333 - $ -
Natural Gas $189,545 68,653 MMBtu $2.76
TOTAL ENERGY COSTS $660,566
RECOMMENDED SAVINGS* $218,794 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,991
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$109,333
Cost:
$9,600
- - - - - - $109,333 - -
-
kWh
-
-
kW-months/year
-
-
$
$109,333
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$96,000
Cost:
$300,000
- - - - $96,000 - - - -
-
kWh
-
-
kW-months/year
$96,000
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,576
Cost:
$9,600
$4,680 147,648 $2,896 295 - - - - $4,680
147,648
kWh
$2,896
295
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,470
Cost:
$9,227
$1,843 57,618 $1,627 166 - - - - $1,843
57,618
kWh
$1,627
166
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,415
Cost:
$675
$1,492 47,069 $923 94 - - - - $1,492
47,069
kWh
$923
94
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$218,794
Cost:
$329,102
$8,015 252,335 $5,446 555 $96,000 - $109,333 - $8,015
252,335
kWh
$5,446
555
kW-months/year
$96,000
-
$
$109,333
-
$
TOTAL IMPLEMENTED Savings:
$9,991
Cost:
$10,275
$6,172 194,717 $3,819 389 - - - - $6,172
194,717
kWh
$3,819
389
kW-months/year
-
-
$
-
-
$
Savings