IAC Assessment: UM0238
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2003
Principal Product Painted Automobile Parts
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 70,000
Annual Production 36,000,000 Pieces
Production Hrs. Annual 3,500
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,664 3,556,980 kWh $0.02
Electricity Demand $135,260 7,365 kW-months/year $18.37
Natural Gas $289,456 48,762 MMBtu $5.94
TOTAL ENERGY COSTS $547,380
RECOMMENDED SAVINGS* $107,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,085
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$55,000
Cost:
$24,610
- - - - - - - - $55,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$55,000
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$28,130
Cost:
$2,624
- - - - $12,445 2,095 $15,685 196,050 - - -
-
kWh
-
-
kW-months/year
$12,445
2,095
MMBtu
$15,685
196,050
Tgal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,191
Cost:
$18,246
$1,837 79,040 $4,354 237 - - - - - - $1,837
79,040
kWh
$4,354
237
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,950
Cost:
$150
$2,850 122,797 $3,100 168 - - - - - - $2,850
122,797
kWh
$3,100
168
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,485
Cost:
$8,300
- - - - $6,485 1,092 - - - - -
-
kWh
-
-
kW-months/year
$6,485
1,092
MMBtu
-
-
Tgal
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,280
Cost:
$2,600
$(-132) (-5,622) $(-355) (-19) $3,767 634 - - - - $(-132)
(-5,622)
kWh
$(-355)
(-19)
kW-months/year
$3,767
634
MMBtu
-
-
Tgal
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,520
Cost:
$895
$518 22,295 $1,002 55 - - - - - - $518
22,295
kWh
$1,002
55
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$924
Cost:
$1,000
$444 19,065 $480 26 - - - - - - $444
19,065
kWh
$480
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$107,480
Cost:
$58,425
$5,517 237,575 $8,581 467 $22,697 3,821 $15,685 196,050 $55,000 - $5,517
237,575
kWh
$8,581
467
kW-months/year
$22,697
3,821
MMBtu
$15,685
196,050
Tgal
$55,000
-
$
TOTAL IMPLEMENTED Savings:
$42,085
Cost:
$11,969
$3,368 145,092 $4,102 223 $18,930 3,187 $15,685 196,050 - - $3,368
145,092
kWh
$4,102
223
kW-months/year
$18,930
3,187
MMBtu
$15,685
196,050
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product