IAC logo
IAC Assessment: UM0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2003
Principal Product Blow Molded Plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 115
Plant Area (Sq.Ft.) 56,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $234,122 5,871,000 kWh $0.04
Electricity Demand $95,188 11,186 kW-months/year $8.51
Electricity Fees $6,396 - $ -
Natural Gas $6,982 1,153 MMBtu $6.06
TOTAL ENERGY COSTS $342,688
RECOMMENDED SAVINGS* $37,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,740
Cost:
$6,270
$8,140 204,143 $1,600 188 $8,140
204,143
kWh
$1,600
188
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$9,195
Cost:
$1,000
$7,115 178,367 $2,080 244 $7,115
178,367
kWh
$2,080
244
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,670
Cost:
$300
$6,705 168,200 $1,965 231 $6,705
168,200
kWh
$1,965
231
kW-months/year
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$5,040
Cost:
$1,100
$3,900 97,775 $1,140 134 $3,900
97,775
kWh
$1,140
134
kW-months/year
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,180
Cost:
$645
$2,630 66,029 $1,550 182 $2,630
66,029
kWh
$1,550
182
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,030
Cost:
$2,170
$800 19,970 $230 27 $800
19,970
kWh
$230
27
kW-months/year
TOTAL RECOMMENDED Savings:
$37,855
Cost:
$11,485
$29,290 734,484 $8,565 1,006 $29,290
734,484
kWh
$8,565
1,006
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand