IAC logo
IAC Assessment: UM0433
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0433
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2013
Principal Product Gypsum Product Manufacturing
NAICS 327420 - Gypsum Product Manufacturing
SIC 3275 - Gypsum Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 50,000
Annual Production 500,000 Pieces
Production Hrs. Annual 7,200
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,318 2,441,760 kWh $0.06
Electricity Demand $108,386 16,095 kW-months/year $6.73
Natural Gas $150,841 17,203 MMBtu $8.77
TOTAL ENERGY COSTS $393,545
RECOMMENDED SAVINGS* $102,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,632
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,008
Cost:
$21,730
$19,535 341,530 $3,473 516 - - $19,535
341,530
kWh
$3,473
516
kW-months/year
-
-
MMBtu
02: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$19,439
Cost:
$2,500
$19,439 339,840 - - - - $19,439
339,840
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$22,580
Cost:
$1,000
- - $22,580 3,355 - - -
-
kWh
$22,580
3,355
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$37,193
Cost:
$1,000
- - - - $37,193 4,242 -
-
kWh
-
-
kW-months/year
$37,193
4,242
MMBtu
TOTAL RECOMMENDED Savings:
$102,220
Cost:
$26,230
$38,974 681,370 $26,053 3,871 $37,193 4,242 $38,974
681,370
kWh
$26,053
3,871
kW-months/year
$37,193
4,242
MMBtu
TOTAL IMPLEMENTED Savings:
$56,632
Cost:
$3,500
$19,439 339,840 - - $37,193 4,242 $19,439
339,840
kWh
-
-
kW-months/year
$37,193
4,242
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu