IAC logo
IAC Assessment: UU0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2001
Principal Product Commercial furniture
NAICS n/a
SIC 2541 - Wood Partitions And Fixtures
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 185,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,080
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,186 960,800 kWh $0.03
Electricity Demand $37,401 4,530 kW-months/year $8.26
Electricity Fees $3,888 - $ -
Natural Gas $54,663 9,559 MMBtu $5.72
TOTAL ENERGY COSTS $144,274
RECOMMENDED SAVINGS* $78,928 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,397
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Primary Product
$ kWh $ kW-months/year $ gal $ gal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,903
Cost:
$875
$863 28,556 $1,040 118 - - - - - - $863
28,556
kWh
$1,040
118
kW-months/year
-
-
gal
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,988
Cost:
$6,235
- - $2,988 339 - - - - - - -
-
kWh
$2,988
339
kW-months/year
-
-
gal
-
-
gal
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,095
Cost:
$21,780
$7,055 233,480 $4,040 458 - - - - - - $7,055
233,480
kWh
$4,040
458
kW-months/year
-
-
gal
-
-
gal
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,328
Cost:
$2,000
- - - - $4,328 142,800 - - - - -
-
kWh
-
-
kW-months/year
$4,328
142,800
gal
-
-
gal
-
-
$
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$1,494
Cost:
-
- - - - - - $1,494 275 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,494
275
gal
-
-
$
06: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$57,120
Cost:
$1,200
- - - - - - - - $57,120 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
$57,120
-
$
TOTAL RECOMMENDED Savings:
$78,928
Cost:
$32,090
$7,918 262,036 $8,068 915 $4,328 142,800 $1,494 275 $57,120 - $7,918
262,036
kWh
$8,068
915
kW-months/year
$4,328
142,800
gal
$1,494
275
gal
$57,120
-
$
TOTAL IMPLEMENTED Savings:
$3,397
Cost:
$875
$863 28,556 $1,040 118 - - $1,494 275 - - $863
28,556
kWh
$1,040
118
kW-months/year
-
-
gal
$1,494
275
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Primary Product