IAC logo
IAC Assessment: UU0012
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0012
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2001
Principal Product Gilsonite
NAICS n/a
SIC 2893 - Printing Ink
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 15,000
Annual Production 25,000 Tons
Production Hrs. Annual 4,590
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $409,092 13,028,400 kWh $0.03
Electricity Demand $382,936 34,812 kW-months/year $11.00
Electricity Fees $26,376 - $ -
Natural Gas $676,288 138,069 MMBtu $4.90
TOTAL ENERGY COSTS $1,494,692
RECOMMENDED SAVINGS* $48,036 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$23,054
Cost:
$55,276
$15,524 494,416 $7,530 685 - - $15,524
494,416
kWh
$7,530
685
kW-months/year
-
-
MMBtu
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$8,209
Cost:
$250
$3,959 126,100 $4,250 386 - - $3,959
126,100
kWh
$4,250
386
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,154
Cost:
$7,500
- - - - $8,154 1,699 -
-
kWh
-
-
kW-months/year
$8,154
1,699
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,600
Cost:
$5,000
- - $6,600 800 - - -
-
kWh
$6,600
800
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,019
Cost:
$1,000
$1,231 39,210 $788 72 - - $1,231
39,210
kWh
$788
72
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,036
Cost:
$69,026
$20,714 659,726 $19,168 1,943 $8,154 1,699 $20,714
659,726
kWh
$19,168
1,943
kW-months/year
$8,154
1,699
MMBtu
TOTAL IMPLEMENTED Savings:
$6,600
Cost:
$5,000
- - $6,600 800 - - -
-
kWh
$6,600
800
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas