IAC logo
IAC Assessment: UU0028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2002
Principal Product Structural Steel, Pressure Vessels, and Plating
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 650,000
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,672 812,760 kWh $0.03
Electricity Demand $34,283 337 kW-months/year $101.73
Electricity Fees $7,848 - $ -
Natural Gas $175,321 30,540 MMBtu $5.74
TOTAL ENERGY COSTS $316,009
RECOMMENDED SAVINGS* $208,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,770
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$986
Cost:
-
- - $986 120 - - - - -
-
kWh
$986
120
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,590
Cost:
$9,800
- - $5,590 713 - - - - -
-
kWh
$5,590
713
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$30,500
Cost:
$7,600
- - - - $30,500 5,140 - - -
-
kWh
-
-
kW-months/year
$30,500
5,140
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,450
Cost:
$700
- - - - $1,450 256 - - -
-
kWh
-
-
kW-months/year
$1,450
256
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$844
Cost:
$406
$497 16,501 $347 42 - - - - $497
16,501
kWh
$347
42
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,400
Cost:
$2,000
$2,000 64,900 $1,400 167 - - - - $2,000
64,900
kWh
$1,400
167
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7145 INSTALL SKYLIGHTS Savings:
$17,689
Cost:
$2,800
$14,633 485,580 $3,056 372 - - - - $14,633
485,580
kWh
$3,056
372
kW-months/year
-
-
MMBtu
-
-
$
08: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$147,880
Cost:
$100,000
- - - - - - $147,880 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$147,880
-
$
TOTAL RECOMMENDED Savings:
$208,339
Cost:
$123,306
$17,130 566,981 $11,379 1,414 $31,950 5,396 $147,880 - $17,130
566,981
kWh
$11,379
1,414
kW-months/year
$31,950
5,396
MMBtu
$147,880
-
$
TOTAL IMPLEMENTED Savings:
$42,770
Cost:
$20,506
$2,497 81,401 $8,323 1,042 $31,950 5,396 - - $2,497
81,401
kWh
$8,323
1,042
kW-months/year
$31,950
5,396
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product