IAC logo
IAC Assessment: UU0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2002
Principal Product emblems precious metal
NAICS n/a
SIC 3911 - Jewelry, Precious Metal
Sales $100,000,000-$500,000,000
# of Employees 1,800
Plant Area (Sq.Ft.) 0
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,954
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,979 7,468,800 kWh $0.03
Electricity Demand $128,162 39,804 kW-months/year $3.22
Electricity Fees $50,764 - $ -
Natural Gas $89,505 95,347 MMBtu $0.94
TOTAL ENERGY COSTS $466,410
RECOMMENDED SAVINGS* $137,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,207
Cost:
$18,000
- - $12,207 116 - - -
-
kWh
$12,207
116
kW-months/year
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,112
Cost:
-
- - $2,112 240 - - -
-
kWh
$2,112
240
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,692
Cost:
$20
$701 23,523 $991 113 - - $701
23,523
kWh
$991
113
kW-months/year
-
-
MMBtu
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$121,213
Cost:
$2,000,000
$54,740 1,817,116 $44,000 5,000 $22,473 9,000 $54,740
1,817,116
kWh
$44,000
5,000
kW-months/year
$22,473
9,000
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58
Cost:
$366
$34 1,043 $24 3 - - $34
1,043
kWh
$24
3
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$137,282
Cost:
$2,018,386
$55,475 1,841,682 $59,334 5,472 $22,473 9,000 $55,475
1,841,682
kWh
$59,334
5,472
kW-months/year
$22,473
9,000
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas