IAC Assessment: UU0042
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product vinyl windows and fencing
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 160,000
Annual Production 8,500,000 Pounds
Production Hrs. Annual 6,864
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,562 1,858,960 kWh $0.03
Electricity Demand $45,684 4,856 kW-months/year $9.41
Natural Gas $11,126 2,383 MMBtu $4.67
TOTAL ENERGY COSTS $108,372
RECOMMENDED SAVINGS* $45,894 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$15,620
Cost:
$8,000
- - - - $15,620 - - - -
-
kWh
-
-
kW-months/year
$15,620
-
$
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,027
Cost:
$1,500
$680 24,000 $347 42 - - - - $680
24,000
kWh
$347
42
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$632
Cost:
$550
$124 4,400 $508 61 - - - - $124
4,400
kWh
$508
61
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,960
Cost:
-
- - $9,960 1,200 - - - - -
-
kWh
$9,960
1,200
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,836
Cost:
$20,051
$1,878 66,065 $958 115 - - - - $1,878
66,065
kWh
$958
115
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$420
Cost:
$406
$278 9,781 $142 17 - - - - $278
9,781
kWh
$142
17
kW-months/year
-
-
$
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$792
Cost:
$2,296
- - - - - - $792 177 -
-
kWh
-
-
kW-months/year
-
-
$
$792
177
MMBtu
08: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$14,607
Cost:
$100,240
$9,670 342,188 $4,937 595 - - - - $9,670
342,188
kWh
$4,937
595
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,894
Cost:
$133,043
$12,630 446,434 $16,852 2,030 $15,620 - $792 177 $12,630
446,434
kWh
$16,852
2,030
kW-months/year
$15,620
-
$
$792
177
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas