IAC logo
IAC Assessment: UU0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product pet food
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 0
Annual Production 50,000 Tons
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $917,866 17,202,441 kWh $0.05
Electricity Demand $377,704 531,672 kW-months/year $0.71
Natural Gas $516,053 216,249 MMBtu $2.39
TOTAL ENERGY COSTS $1,811,623
RECOMMENDED SAVINGS* $98,965 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,686
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$16,936
Cost:
$5,500
$7,824 257,028 $9,112 1,098 - - - - - - $7,824
257,028
kWh
$9,112
1,098
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$50,075
Cost:
-
- - $50,075 6,036 - - - - - - -
-
kWh
$50,075
6,036
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,187
Cost:
$14,400
- - - - $12,187 - - - - - -
-
kWh
-
-
kW-months/year
$12,187
-
$
-
-
MMBtu
-
-
Tgal
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,186
Cost:
$9,000
- - - - - - $4,186 1,821 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,186
1,821
MMBtu
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,168
Cost:
$750
$2,461 80,835 $3,707 447 - - - - - - $2,461
80,835
kWh
$3,707
447
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,686
Cost:
$7,815
$2,280 74,914 $1,406 170 - - - - - - $2,280
74,914
kWh
$1,406
170
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$5,727
Cost:
$3,889
$(-1,161) (-38,156) $(-606) (-73) - - - - $7,494 4,840,000 $(-1,161)
(-38,156)
kWh
$(-606)
(-73)
kW-months/year
-
-
$
-
-
MMBtu
$7,494
4,840,000
Tgal
TOTAL RECOMMENDED Savings:
$98,965
Cost:
$41,354
$11,404 374,621 $63,694 7,678 $12,187 - $4,186 1,821 $7,494 4,840,000 $11,404
374,621
kWh
$63,694
7,678
kW-months/year
$12,187
-
$
$4,186
1,821
MMBtu
$7,494
4,840,000
Tgal
TOTAL IMPLEMENTED Savings:
$3,686
Cost:
$7,815
$2,280 74,914 $1,406 170 - - - - - - $2,280
74,914
kWh
$1,406
170
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal