IAC logo
IAC Assessment: UU0060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product aircraft parts
NAICS 336411 - Aircraft Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 276
Plant Area (Sq.Ft.) 232,000
Annual Production 291,500 Pieces
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,423 5,737,240 kWh $0.02
Electricity Demand $77,879 12,584 kW-months/year $6.19
Electricity Fees $28,560 - $ -
Natural Gas $59,383 11,754 MMBtu $5.05
TOTAL ENERGY COSTS $304,178
RECOMMENDED SAVINGS* $25,062 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,158
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,202
Cost:
$13,200
$(-642) (-27,502) $3,844 582 - - $(-642)
(-27,502)
kWh
$3,844
582
kW-months/year
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,695
Cost:
$4,800
$87 3,741 $5,608 849 - - $87
3,741
kWh
$5,608
849
kW-months/year
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$5,059
Cost:
$4,000
$613 26,253 $4,446 673 - - $613
26,253
kWh
$4,446
673
kW-months/year
-
-
$
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,047
Cost:
$2,600
$3,047 130,500 - - - - $3,047
130,500
kWh
-
-
kW-months/year
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$309
Cost:
$723
$223 9,534 $86 13 - - $223
9,534
kWh
$86
13
kW-months/year
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,853
Cost:
-
- - $2,853 432 - - -
-
kWh
$2,853
432
kW-months/year
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,897
Cost:
$200
- - - - $4,897 - -
-
kWh
-
-
kW-months/year
$4,897
-
$
TOTAL RECOMMENDED Savings:
$25,062
Cost:
$25,523
$3,328 142,526 $16,837 2,549 $4,897 - $3,328
142,526
kWh
$16,837
2,549
kW-months/year
$4,897
-
$
TOTAL IMPLEMENTED Savings:
$13,158
Cost:
$17,400
$(-29) (-1,249) $8,290 1,255 $4,897 - $(-29)
(-1,249)
kWh
$8,290
1,255
kW-months/year
$4,897
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees