IAC logo
IAC Assessment: UU0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product boxes
NAICS 322212 - Folding Paperboard Box Manufacturing
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 206
Plant Area (Sq.Ft.) 180,190
Annual Production 50,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,858 2,839,886 kWh $0.03
Electricity Demand $98,504 12,477 kW-months/year $7.89
Electricity Fees $31,490 - $ -
Natural Gas $40,708 7,531 MMBtu $5.41
TOTAL ENERGY COSTS $251,560
RECOMMENDED SAVINGS* $2,525,408 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,404
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,920
Cost:
$20,250
- - - - $12,920 - - - -
-
kWh
-
-
kW-months/year
$12,920
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,404
Cost:
$790
$650 21,600 $754 85 - - - - $650
21,600
kWh
$754
85
kW-months/year
-
-
$
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$380
Cost:
$280
$200 6,600 $180 20 - - - - $200
6,600
kWh
$180
20
kW-months/year
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$392
Cost:
$1,990
$146 4,800 $246 28 - - - - $146
4,800
kWh
$246
28
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,690
Cost:
$3,226
$726 23,800 $964 109 - - - - $726
23,800
kWh
$964
109
kW-months/year
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$262
Cost:
$440
$262 8,600 - - - - - - $262
8,600
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$2,508,360
Cost:
$6,420,700
- - - - - - $2,508,360 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,508,360
-
$
TOTAL RECOMMENDED Savings:
$2,525,408
Cost:
$6,447,676
$1,984 65,400 $2,144 242 $12,920 - $2,508,360 - $1,984
65,400
kWh
$2,144
242
kW-months/year
$12,920
-
$
$2,508,360
-
$
TOTAL IMPLEMENTED Savings:
$1,404
Cost:
$790
$650 21,600 $754 85 - - - - $650
21,600
kWh
$754
85
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost