IAC Assessment: UU0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product climbing equipment
NAICS 339920 - Sporting and Athletic Goods Manufacturing
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 96,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,290
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,345 1,815,080 kWh $0.03
Electricity Demand $53,258 6,575 kW-months/year $8.10
Electricity Fees $9,566 - $ -
Natural Gas $6,625 1,275 MMBtu $5.20
TOTAL ENERGY COSTS $119,794
RECOMMENDED SAVINGS* $14,693 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,983
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,060
Cost:
$5,520
- - - - $4,060 - -
-
kWh
-
-
kW-months/year
$4,060
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,450
Cost:
-
- - $6,450 660 - - -
-
kWh
$6,450
660
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,345
Cost:
$1,100
$690 24,000 $655 67 - - $690
24,000
kWh
$655
67
kW-months/year
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,188
Cost:
$225
$602 21,000 $586 60 - - $602
21,000
kWh
$586
60
kW-months/year
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,650
Cost:
$675
$1,650 57,600 - - - - $1,650
57,600
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$14,693
Cost:
$7,520
$2,942 102,600 $7,691 787 $4,060 - $2,942
102,600
kWh
$7,691
787
kW-months/year
$4,060
-
$
TOTAL IMPLEMENTED Savings:
$8,983
Cost:
$1,325
$1,292 45,000 $7,691 787 - - $1,292
45,000
kWh
$7,691
787
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees