IAC logo
IAC Assessment: UU0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product chelated minerals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $1,000,000-$5,000,000
# of Employees 18
Plant Area (Sq.Ft.) 0
Annual Production 1,000,000 Pounds
Production Hrs. Annual 4,940
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,497 739,280 kWh $0.03
Electricity Demand $32,051 3,732 kW-months/year $8.59
Natural Gas $40,456 6,556 MMBtu $6.17
TOTAL ENERGY COSTS $97,004
RECOMMENDED SAVINGS* $12,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,544
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,645
Cost:
$2,000
- - $3,645 332 - - -
-
kWh
$3,645
332
kW-months/year
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,294
Cost:
-
- - $3,294 300 - - -
-
kWh
$3,294
300
kW-months/year
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,655
Cost:
$3,894
$1,021 31,632 $634 58 - - $1,021
31,632
kWh
$634
58
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,950
Cost:
$400
- - - - $1,950 348 -
-
kWh
-
-
kW-months/year
$1,950
348
MMBtu
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,376
Cost:
$2,400
$479 14,976 $1,897 172 - - $479
14,976
kWh
$1,897
172
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,920
Cost:
$8,694
$1,500 46,608 $9,470 862 $1,950 348 $1,500
46,608
kWh
$9,470
862
kW-months/year
$1,950
348
MMBtu
TOTAL IMPLEMENTED Savings:
$10,544
Cost:
$6,294
$1,021 31,632 $7,573 690 $1,950 348 $1,021
31,632
kWh
$7,573
690
kW-months/year
$1,950
348
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas