IAC Assessment: UU0086
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0086
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2005
Principal Product aerospace products
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 475
Plant Area (Sq.Ft.) 240,000
Annual Production 4,000 Pieces
Production Hrs. Annual 6,000
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,148 8,622,000 kWh $0.03
Electricity Demand $164,880 17,466 kW-months/year $9.44
TOTAL ENERGY COSTS $404,028
RECOMMENDED SAVINGS* $48,965 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,056
Cost:
$12,620
$5,578 201,700 $2,478 206 - - - - $5,578
201,700
kWh
$2,478
206
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,984
Cost:
$6,400
$2,132 77,100 $1,852 154 - - - - $2,132
77,100
kWh
$1,852
154
kW-months/year
-
-
$
-
-
MMBtu
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$17,445
Cost:
$3,600
$9,170 331,700 $8,275 688 - - - - $9,170
331,700
kWh
$8,275
688
kW-months/year
-
-
$
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,447
Cost:
$21,000
$3,858 139,500 $3,356 279 - - $(-3,767) (-595) $3,858
139,500
kWh
$3,356
279
kW-months/year
-
-
$
$(-3,767)
(-595)
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$773
Cost:
$4,320
$412 14,900 $361 30 - - - - $412
14,900
kWh
$361
30
kW-months/year
-
-
$
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$15,260
Cost:
$14,000
- - - - $15,260 - - - -
-
kWh
-
-
kW-months/year
$15,260
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,965
Cost:
$61,940
$21,150 764,900 $16,322 1,357 $15,260 - $(-3,767) (-595) $21,150
764,900
kWh
$16,322
1,357
kW-months/year
$15,260
-
$
$(-3,767)
(-595)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas