IAC logo
IAC Assessment: UU0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Cardboard boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 500,000
Annual Production 1,524,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,150 12,599,100 kWh $0.03
Electricity Demand $190,746 26,046 kW-months/year $7.32
Natural Gas $403,585 151,032 MMBtu $2.67
TOTAL ENERGY COSTS $997,481
RECOMMENDED SAVINGS* $329,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$58,512
Cost:
$25,405
- - $58,512 5,520 - - - - -
-
kWh
$58,512
5,520
kW-months/year
-
-
MMBtu
-
-
$
02: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$177,372
Cost:
$808,858
- - - - - - $177,372 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$177,372
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,790
Cost:
$2,000
- - - - $6,790 1,150 - - -
-
kWh
-
-
kW-months/year
$6,790
1,150
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,461
Cost:
$4,840
- - - - $7,461 1,320 - - -
-
kWh
-
-
kW-months/year
$7,461
1,320
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,191
Cost:
$740
$714 23,200 $477 45 - - - - $714
23,200
kWh
$477
45
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,770
Cost:
$1,500
$2,770 90,000 - - - - - - $2,770
90,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$1,960
Cost:
$2,900
$1,960 63,800 - - - - - - $1,960
63,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,113
Cost:
$3,570
$2,113 68,700 - - - - - - $2,113
68,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$71,588
Cost:
$180,000
$71,588 2,328,000 - - - - - - $71,588
2,328,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$329,757
Cost:
$1,029,813
$79,145 2,573,700 $58,989 5,565 $14,251 2,470 $177,372 - $79,145
2,573,700
kWh
$58,989
5,565
kW-months/year
$14,251
2,470
MMBtu
$177,372
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes