IAC Assessment: UU0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product printed materials
NAICS 323113 - Commercial Screen Printing
SIC 2759 - Commercial Printing, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 30,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 2,496
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,513 563,820 kWh $0.03
Electricity Demand $28,998 2,655 kW-months/year $10.92
Natural Gas $25,905 2,905 MMBtu $8.92
TOTAL ENERGY COSTS $69,416
RECOMMENDED SAVINGS* $61,426 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,610
Cost:
$1,995
$1,760 62,730 $850 69 - - $1,760
62,730
kWh
$850
69
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$560
Cost:
$25
$380 13,400 $180 15 - - $380
13,400
kWh
$180
15
kW-months/year
-
-
$
03: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$2,760
Cost:
$212
$1,860 66,130 $900 73 - - $1,860
66,130
kWh
$900
73
kW-months/year
-
-
$
04: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$47,500
Cost:
$23,700
- - - - $47,500 - -
-
kWh
-
-
kW-months/year
$47,500
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,510
Cost:
$5,000
- - $6,510 528 - - -
-
kWh
$6,510
528
kW-months/year
-
-
$
06: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$706
Cost:
-
- - - - $706 - -
-
kWh
-
-
kW-months/year
$706
-
$
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$50
Cost:
$115
$50 1,935 - - - - $50
1,935
kWh
-
-
kW-months/year
-
-
$
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$730
Cost:
$6,080
$730 26,090 - - - - $730
26,090
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$61,426
Cost:
$37,127
$4,780 170,285 $8,440 685 $48,206 - $4,780
170,285
kWh
$8,440
685
kW-months/year
$48,206
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes