IAC Assessment: UU0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2017
Principal Product Guidance Systems
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 278,000
Annual Production 10,000 Units
Production Hrs. Annual 8,424
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $740,863 19,696,800 kWh $0.04
Electricity Demand $38,866 2,932 kW-months/year $13.26
Electricity Fees $167,452 - $ -
Natural Gas $232,120 39,873 MMBtu $5.82
TOTAL ENERGY COSTS $1,179,301
RECOMMENDED SAVINGS* $155,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,808
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$57,965
Cost:
$96,413
$33,753 888,234 $17,816 1,344 $6,396 - - - $33,753
888,234
kWh
$17,816
1,344
kW-months/year
$6,396
-
$
-
-
MMBtu
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$34,105
Cost:
$2,426
$20,676 544,093 $9,882 745 $3,548 - - - $20,676
544,093
kWh
$9,882
745
kW-months/year
$3,548
-
$
-
-
MMBtu
03: 2.5194 REDESIGN PROCESS Savings:
$25,877
Cost:
$35,010
$15,624 413,383 $7,544 569 $2,709 - - - $15,624
413,383
kWh
$7,544
569
kW-months/year
$2,709
-
$
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$21,087
Cost:
$100
- - - - - - $21,087 3,623 -
-
kWh
-
-
kW-months/year
-
-
$
$21,087
3,623
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,843
Cost:
$1,647
$7,180 188,937 $3,431 259 $1,232 - - - $7,180
188,937
kWh
$3,431
259
kW-months/year
$1,232
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,522
Cost:
-
$2,333 61,401 $875 66 $314 - - - $2,333
61,401
kWh
$875
66
kW-months/year
$314
-
$
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$779
Cost:
$1,695
$341 8,979 $322 24 $116 - - - $341
8,979
kWh
$322
24
kW-months/year
$116
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$155,178
Cost:
$137,291
$79,906 2,105,027 $39,870 3,007 $14,315 - $21,087 3,623 $79,906
2,105,027
kWh
$39,870
3,007
kW-months/year
$14,315
-
$
$21,087
3,623
MMBtu
TOTAL IMPLEMENTED Savings:
$69,808
Cost:
$98,060
$40,933 1,077,171 $21,247 1,603 $7,628 - - - $40,933
1,077,171
kWh
$21,247
1,603
kW-months/year
$7,628
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas