IAC logo
IAC Assessment: UU0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2017
Principal Product Dietary Supplements
NAICS 325411 - Medicinal and Botanical Manufacturing
SIC 2833 - Medicinals And Botanicals
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 18,800
Annual Production 13,000,000 Units
Production Hrs. Annual 6,240
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,332 1,327,204 kWh $0.04
Electricity Demand $45,680 3,694 kW-months/year $12.37
Electricity Fees $32,791 - $ -
Natural Gas $16,521 1,974 MMBtu $8.37
TOTAL ENERGY COSTS $147,324
RECOMMENDED SAVINGS* $23,628 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,029
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,742
Cost:
$3,975
$2,562 65,700 $3,738 300 $1,212 - $(-1,770) (-224) - - - - $2,562
65,700
kWh
$3,738
300
kW-months/year
$1,212
-
$
$(-1,770)
(-224)
MMBtu
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,431
Cost:
$4,250
- - - - $4,431 - - - - - - - -
-
kWh
-
-
kW-months/year
$4,431
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,428
Cost:
-
- - $3,344 268 $1,085 - - - - - - - -
-
kWh
$3,344
268
kW-months/year
$1,085
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$2,918
Cost:
-
- - - - - - - - $2,918 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,918
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,903
Cost:
$2,472
$1,604 41,128 $979 79 $320 - - - - - - - $1,604
41,128
kWh
$979
79
kW-months/year
$320
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,324
Cost:
$3,000
- - - - $1,324 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,324
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,100
Cost:
-
- - - - - - - - - - $1,100 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$1,100
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$657
Cost:
$1,125
- - - - $657 - - - - - - - -
-
kWh
-
-
kW-months/year
$657
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$127
Cost:
$240
$127 3,245 - - - - - - - - - - $127
3,245
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,628
Cost:
$15,062
$4,293 110,073 $8,061 648 $9,027 - $(-1,770) (-224) $2,918 - $1,100 - $4,293
110,073
kWh
$8,061
648
kW-months/year
$9,027
-
$
$(-1,770)
(-224)
MMBtu
$2,918
-
$
$1,100
-
$
TOTAL IMPLEMENTED Savings:
$3,029
Cost:
$2,712
$1,731 44,373 $979 79 $320 - - - - - - - $1,731
44,373
kWh
$979
79
kW-months/year
$320
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes By-product Production