IAC Assessment: UU0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2018
Principal Product Aircraft parts and assemblies
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 300
Plant Area (Sq.Ft.) 130,000
Annual Production 750 Units
Production Hrs. Annual 3,840
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,534 1,152,651 kWh $0.04
Electricity Demand $74,999 4,363 kW-months/year $17.19
TOTAL ENERGY COSTS $123,708
RECOMMENDED SAVINGS* $37,405 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,405
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,622
Cost:
-
- - $13,622 792 - - - - - - - - -
-
kWh
$13,622
792
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
02: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$9,283
Cost:
$120
- - $9,283 540 - - - - - - - - -
-
kWh
$9,283
540
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,783
Cost:
$500
- - - - $7,783 - - - - - - - -
-
kWh
-
-
kW-months/year
$7,783
-
$
-
-
lb
-
-
$
-
-
$
04: 3.5241 SELL USED PLATES TO AN ALUMINUM RECYCLER Savings:
$5,775
Cost:
-
- - - - - - $6,175 10,864 - - $(-400) - -
-
kWh
-
-
kW-months/year
-
-
$
$6,175
10,864
lb
-
-
$
$(-400)
-
$
05: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$942
Cost:
$80
$274 7,200 $1,196 80 - - - - $(-528) - - - $274
7,200
kWh
$1,196
80
kW-months/year
-
-
$
-
-
lb
$(-528)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,405
Cost:
$700
$274 7,200 $24,101 1,412 $7,783 - $6,175 10,864 $(-528) - $(-400) - $274
7,200
kWh
$24,101
1,412
kW-months/year
$7,783
-
$
$6,175
10,864
lb
$(-528)
-
$
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$37,405
Cost:
$700
$274 7,200 $24,101 1,412 $7,783 - $6,175 10,864 $(-528) - $(-400) - $274
7,200
kWh
$24,101
1,412
kW-months/year
$7,783
-
$
$6,175
10,864
lb
$(-528)
-
$
$(-400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes