Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2018 |
Principal Product | Aircraft parts and assemblies |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 750 Units |
Production Hrs. Annual | 3,840 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $42,534 | 1,152,651 | kWh | $0.04 |
Electricity Demand | $74,999 | 4,363 | kW-months/year | $17.19 |
TOTAL ENERGY COSTS | $123,708 | |||
RECOMMENDED SAVINGS* | $37,405 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,405 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $13,622 Cost: - |
- | - | $13,622 | 792 | - | - | - | - | - | - | - | - |
- - kWh |
$13,622 792 kW-months/year |
- - $ |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS |
Savings: $9,283 Cost: $120 |
- | - | $9,283 | 540 | - | - | - | - | - | - | - | - |
- - kWh |
$9,283 540 kW-months/year |
- - $ |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $7,783 Cost: $500 |
- | - | - | - | $7,783 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,783 - $ |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5241 SELL USED PLATES TO AN ALUMINUM RECYCLER |
Savings: $5,775 Cost: - |
- | - | - | - | - | - | $6,175 | 10,864 | - | - | $(-400) | - |
- - kWh |
- - kW-months/year |
- - $ |
$6,175 10,864 lb |
- - $ |
$(-400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6125 KEEP EQUIPMENT CLEAN |
Savings: $942 Cost: $80 |
$274 | 7,200 | $1,196 | 80 | - | - | - | - | $(-528) | - | - | - |
$274 7,200 kWh |
$1,196 80 kW-months/year |
- - $ |
- - lb |
$(-528) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,405 Cost: $700 |
$274 | 7,200 | $24,101 | 1,412 | $7,783 | - | $6,175 | 10,864 | $(-528) | - | $(-400) | - | $274 7,200 kWh |
$24,101 1,412 kW-months/year |
$7,783 - $ |
$6,175 10,864 lb |
$(-528) - $ |
$(-400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,405 Cost: $700 |
$274 | 7,200 | $24,101 | 1,412 | $7,783 | - | $6,175 | 10,864 | $(-528) | - | $(-400) | - | $274 7,200 kWh |
$24,101 1,412 kW-months/year |
$7,783 - $ |
$6,175 10,864 lb |
$(-528) - $ |
$(-400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||