IAC Center University of Utah
Assessment Year 2019
Principal Product Copper
NAICS 212234 - Copper Ore and Nickel Ore Mining
SIC 1021 - Copper Ores
Sales $438,000,000
# of Employees 600
Plant Area (Sq.Ft.) 236,790
Annual Production 53,700 not found
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage
Electricity Usage $5,143,832 213,581,205
Electricity Demand $6,927,291 344,958
TOTAL ENERGY COSTS $12,071,123
RECOMMENDED SAVINGS* $894,583 *Non-energy impacts
included in savings.
IMPLEMENTED SAVINGS* -
#|Description Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW/month
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$377,567
Cost:
$872,000
$176,321 7,316,212 $201,246 10,020 $176,321
7,316,212
kWh
$201,246
10,020
kW/month
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$373,488
Cost:
$10,000
- - $373,488 18,600 -
-
kWh
$373,488
18,600
kW/month
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$68,566
Cost:
$36,000
$32,019 1,328,000 $36,547 1,820 $32,019
1,328,000
kWh
$36,547
1,820
kW/month
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$47,010
Cost:
$23,850
$21,950 910,800 $25,060 1,248 $21,950
910,800
kWh
$25,060
1,248
kW/month
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$25,041
Cost:
$5,000
$11,692 485,129 $13,349 665 $11,692
485,129
kWh
$13,349
665
kW/month
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,250
Cost:
$4,719
$1,050 43,651 $1,200 60 $1,050
43,651
kWh
$1,200
60
kW/month
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$661
Cost:
$440
$661 27,417 - - $661
27,417
kWh
-
-
kW/month
TOTAL RECOMMENDED Savings:
$894,583
Cost:
$952,009
$243,693 10,111,209 $650,890 32,413 $243,693
10,111,209
kWh
$650,890
32,413
kW/month
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW/month
$ kWh $ kW/month
Electricity Usage Electricity Demand Electricity Usage Electricity Demand
Back to Top