IAC logo
IAC Assessment: UU0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2019
Principal Product Propellant Pellets
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 350
Plant Area (Sq.Ft.) 188,625
Annual Production 3,500 Units
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $997,805 30,555,960 kWh $0.03
Electricity Demand $711,435 53,836 kW-months/year $13.21
Natural Gas $354,362 146,505 MMBtu $2.42
TOTAL ENERGY COSTS $2,063,602
RECOMMENDED SAVINGS* $1,033,816 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $199,264
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$567,696
Cost:
$2,355,000
$596,044 18,250,000 $330,323 25,006 $(-241,671) (-99,864) $(-117,000) - $596,044
18,250,000
kWh
$330,323
25,006
kW-months/year
$(-241,671)
(-99,864)
MMBtu
$(-117,000)
-
$
02: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$262,908
Cost:
$2,299,950
$342,560 10,380,600 $187,846 14,220 $(-174,073) (-71,950) $(-93,425) - $342,560
10,380,600
kWh
$187,846
14,220
kW-months/year
$(-174,073)
(-71,950)
MMBtu
$(-93,425)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$170,761
Cost:
$461,313
$110,730 3,390,380 $60,031 4,544 - - - - $110,730
3,390,380
kWh
$60,031
4,544
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,288
Cost:
$2,040
$11,773 360,314 $6,515 493 - - - - $11,773
360,314
kWh
$6,515
493
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,215
Cost:
$3,044
- - - - $10,215 4,221 - - -
-
kWh
-
-
kW-months/year
$10,215
4,221
MMBtu
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,947
Cost:
$2,000
- - $3,947 299 - - - - -
-
kWh
$3,947
299
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,033,816
Cost:
$5,123,347
$1,061,107 32,381,294 $588,662 44,562 $(-405,529) (-167,593) $(-210,425) - $1,061,107
32,381,294
kWh
$588,662
44,562
kW-months/year
$(-405,529)
(-167,593)
MMBtu
$(-210,425)
-
$
TOTAL IMPLEMENTED Savings:
$199,264
Cost:
$466,397
$122,503 3,750,694 $66,546 5,038 $10,215 4,221 - - $122,503
3,750,694
kWh
$66,546
5,038
kW-months/year
$10,215
4,221
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost