Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2020 |
Principal Product | Printed materials |
NAICS | 323111 - Commercial Printing (except Screen and Books) |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $100,000,000-$500,000,000 |
# of Employees | 430 |
Plant Area (Sq.Ft.) | 525,000 |
Annual Production | 40,000,000 Units |
Production Hrs. Annual | 5,928 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $388,778 | 11,592,000 | kWh | $0.03 |
Electricity Demand | $407,358 | 29,960 | kW-months/year | $13.60 |
Electricity Fees | $67,597 | - | $ | - |
Natural Gas | $74,830 | 15,606 | MMBtu | $4.79 |
TOTAL ENERGY COSTS | $938,563 | |||
RECOMMENDED SAVINGS* | $44,421 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,516 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS |
Savings: $18,960 Cost: $212,180 |
- | - | - | - | - | - | $18,960 | 2,280 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$18,960 2,280 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,704 Cost: $52,483 |
$7,068 | 207,871 | $7,636 | 562 | - | - | - | - |
$7,068 207,871 kWh |
$7,636 562 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $5,545 Cost: $1,200 |
$5,545 | 163,080 | - | - | - | - | - | - |
$5,545 163,080 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,448 Cost: $1,660 |
- | - | $2,448 | 180 | - | - | - | - |
- - kWh |
$2,448 180 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,409 Cost: $600 |
$1,360 | 40,000 | $49 | 4 | - | - | - | - |
$1,360 40,000 kWh |
$49 4 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $912 Cost: $100 |
$912 | 26,810 | - | - | - | - | - | - |
$912 26,810 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS |
Savings: $443 Cost: $300 |
$146 | 4,285 | - | - | $297 | 62 | - | - |
$146 4,285 kWh |
- - kW-months/year |
$297 62 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,421 Cost: $268,523 |
$15,031 | 442,046 | $10,133 | 745 | $297 | 62 | $18,960 | 2,280 | $15,031 442,046 kWh |
$10,133 745 kW-months/year |
$297 62 MMBtu |
$18,960 2,280 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,516 Cost: $265,563 |
$8,574 | 252,156 | $7,685 | 565 | $297 | 62 | $18,960 | 2,280 | $8,574 252,156 kWh |
$7,685 565 kW-months/year |
$297 62 MMBtu |
$18,960 2,280 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage |