IAC logo
IAC Assessment: UU0183
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0183
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 33
Plant Area (Sq.Ft.) 105,000
Annual Production 11,680,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $376,194 11,510,400 kWh $0.03
Electricity Demand $269,768 19,738 kW-months/year $13.67
Electricity Fees $17,258 - $ -
Natural Gas $146,506 24,116 MMBtu $6.08
TOTAL ENERGY COSTS $809,726
RECOMMENDED SAVINGS* $446,395 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $190,992
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$149,294
Cost:
$144,000
- - - - - - $149,294 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$149,294
-
$
02: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$118,667
Cost:
$7,000
- - - - $118,667 21,704 - - -
-
kWh
-
-
kW-months/year
$118,667
21,704
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$100,049
Cost:
$157,500
$100,049 3,031,779 - - - - - - $100,049
3,031,779
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$35,893
Cost:
$14,200
- - - - - - $35,893 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$35,893
-
$
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$19,111
Cost:
$20,527
$19,111 579,121 - - - - - - $19,111
579,121
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$15,681
Cost:
$1,607
$5,348 162,066 - - $10,333 1,701 - - $5,348
162,066
kWh
-
-
kW-months/year
$10,333
1,701
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,906
Cost:
$22,506
$2,098 63,585 $4,807 352 - - - - $2,098
63,585
kWh
$4,807
352
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$794
Cost:
$1,175
$(-57) (-1,740) - - $851 140 - - $(-57)
(-1,740)
kWh
-
-
kW-months/year
$851
140
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$446,395
Cost:
$368,515
$126,549 3,834,811 $4,807 352 $129,851 23,545 $185,187 - $126,549
3,834,811
kWh
$4,807
352
kW-months/year
$129,851
23,545
MMBtu
$185,187
-
$
TOTAL IMPLEMENTED Savings:
$190,992
Cost:
$188,640
$26,557 804,772 $4,807 352 $10,333 1,701 $149,294 - $26,557
804,772
kWh
$4,807
352
kW-months/year
$10,333
1,701
MMBtu
$149,294
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes