Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2022
Principal Product Copper
NAICS 212234 - Copper Ore and Nickel Ore Mining
SIC 1021 - Copper Ores
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 236,790
Annual Production 53,700 Units
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $7,370,860 293,659,778 kWh $0.03
Electricity Demand $9,245,579 444,712 kW-months/year $20.79
TOTAL ENERGY COSTS $16,616,439
RECOMMENDED SAVINGS* $649,479 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $648,533
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$269,225
Cost:
$7,636,800
$251,907 10,036,140 $17,318 833 $251,907
10,036,140
kWh
$17,318
833
kW-months/year
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$371,933
Cost:
$40,000
- - $371,933 17,890 -
-
kWh
$371,933
17,890
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,764
Cost:
$4,720
$1,292 51,522 $1,472 71 $1,292
51,522
kWh
$1,472
71
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,736
Cost:
$1,307
$1,282 51,070 $1,454 70 $1,282
51,070
kWh
$1,454
70
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,875
Cost:
$5,000
$879 35,000 $996 48 $879
35,000
kWh
$996
48
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$946
Cost:
$3,500
$946 38,410 - - $946
38,410
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$649,479
Cost:
$7,691,327
$256,306 10,212,142 $393,173 18,912 $256,306
10,212,142
kWh
$393,173
18,912
kW-months/year
TOTAL IMPLEMENTED Savings:
$648,533
Cost:
$7,687,827
$255,360 10,173,732 $393,173 18,912 $255,360
10,173,732
kWh
$393,173
18,912
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand