IAC logo
IAC Assessment: UU0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2022
Principal Product Toothpaste and mouth wash
NAICS 339114 - Dental Equipment and Supplies Manufacturing
SIC 3843 - Dental Equipment And Supplies
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 250,000
Annual Production 12,000,000 Units
Production Hrs. Annual 8,592
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,987 6,109,200 kWh $0.04
Electricity Demand $207,172 12,748 kW-months/year $16.25
TOTAL ENERGY COSTS $427,159
RECOMMENDED SAVINGS* $20,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,503
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$9,239
Cost:
$4,868
$8,778 243,841 $460 28 $8,778
243,841
kWh
$460
28
kW-months/year
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$6,969
Cost:
$37,350
$6,156 171,000 $813 50 $6,156
171,000
kWh
$813
50
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,884
Cost:
$378
$1,769 49,146 $1,115 69 $1,769
49,146
kWh
$1,115
69
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,264
Cost:
$2,575
$687 19,082 $577 36 $687
19,082
kWh
$577
36
kW-months/year
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$200
Cost:
$564
$153 4,238 $47 3 $153
4,238
kWh
$47
3
kW-months/year
TOTAL RECOMMENDED Savings:
$20,555
Cost:
$45,735
$17,543 487,307 $3,013 185 $17,543
487,307
kWh
$3,013
185
kW-months/year
TOTAL IMPLEMENTED Savings:
$10,503
Cost:
$7,443
$9,465 262,923 $1,037 64 $9,465
262,923
kWh
$1,037
64
kW-months/year
Savings