IAC Assessment: UU0215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2023
Principal Product Aerospace Structural Components
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales $10,000,000-$50,000,000
# of Employees 227
Plant Area (Sq.Ft.) 153,616
Annual Production 9,000 Units
Production Hrs. Annual 6,300
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,435 1,763,468 kWh $0.04
Electricity Demand $84,608 5,014 kW-months/year $16.87
Electricity Fees $19,495 - $ -
Natural Gas $129,387 13,094 MMBtu $9.88
TOTAL ENERGY COSTS $296,925
RECOMMENDED SAVINGS* $37,699 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,939
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$13,760
Cost:
$120,564
$4,648 129,123 $9,112 540 - - - - $4,648
129,123
kWh
$9,112
540
kW-months/year
-
-
$
-
-
MMBtu
02: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$4,878
Cost:
$48,510
- - - - - - $4,878 494 -
-
kWh
-
-
kW-months/year
-
-
$
$4,878
494
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,368
Cost:
$27,177
$3,044 84,320 $3,324 197 - - - - $3,044
84,320
kWh
$3,324
197
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,775
Cost:
$52,882
$2,653 73,704 $3,122 185 - - - - $2,653
73,704
kWh
$3,122
185
kW-months/year
-
-
$
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,212
Cost:
$5,850
- - - - $3,212 - - - -
-
kWh
-
-
kW-months/year
$3,212
-
$
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,565
Cost:
$1,563
$2,565 71,252 - - - - - - $2,565
71,252
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.5194 REDESIGN PROCESS Savings:
$913
Cost:
$2,360
$334 9,277 $579 34 - - - - $334
9,277
kWh
$579
34
kW-months/year
-
-
$
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$228
Cost:
$1,725
$132 3,670 $96 6 - - - - $132
3,670
kWh
$96
6
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$37,699
Cost:
$260,631
$13,376 371,346 $16,233 962 $3,212 - $4,878 494 $13,376
371,346
kWh
$16,233
962
kW-months/year
$3,212
-
$
$4,878
494
MMBtu
TOTAL IMPLEMENTED Savings:
$23,939
Cost:
$140,067
$8,728 242,223 $7,121 422 $3,212 - $4,878 494 $8,728
242,223
kWh
$7,121
422
kW-months/year
$3,212
-
$
$4,878
494
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas