IAC logo
IAC Assessment: UU0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2023
Principal Product Health and beauty liquids/gels/powders
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 380,000
Annual Production 7,280,000 Units
Production Hrs. Annual 3,640
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,302 1,625,760 kWh $0.10
Electricity Demand $10,003 1,343 kW-months/year $7.45
Electricity Fees $31,920 - $ -
Natural Gas $206,377 14,601 MMBtu $14.13
TOTAL ENERGY COSTS $414,602
RECOMMENDED SAVINGS* $105,742 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,018
Cost:
$26,647
$9,048 88,706 - - $11,970 847 $9,048
88,706
kWh
-
-
kW-months/year
$11,970
847
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$8,818
Cost:
$12,930
- - - - $8,818 624 -
-
kWh
-
-
kW-months/year
$8,818
624
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,861
Cost:
$1,200
$1,495 14,657 $366 49 - - $1,495
14,657
kWh
$366
49
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,277
Cost:
$2,970
$1,277 12,515 - - - - $1,277
12,515
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,607
Cost:
$4,819
- - - - $4,607 326 -
-
kWh
-
-
kW-months/year
$4,607
326
MMBtu
06: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$7,985
Cost:
$11,730
- - - - $7,985 565 -
-
kWh
-
-
kW-months/year
$7,985
565
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$32,123
Cost:
$20,174
- - - - $32,123 2,273 -
-
kWh
-
-
kW-months/year
$32,123
2,273
MMBtu
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,790
Cost:
$1,000
- - - - $9,790 1,610 -
-
kWh
-
-
kW-months/year
$9,790
1,610
MMBtu
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,682
Cost:
$2,000
- - $2,682 360 - - -
-
kWh
$2,682
360
kW-months/year
-
-
MMBtu
10: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,460
Cost:
$1,000
- - $2,460 330 - - -
-
kWh
$2,460
330
kW-months/year
-
-
MMBtu
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,121
Cost:
$33,692
$12,147 119,086 $975 131 - - $12,147
119,086
kWh
$975
131
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$105,742
Cost:
$118,162
$23,967 234,964 $6,482 870 $75,293 6,245 $23,967
234,964
kWh
$6,482
870
kW-months/year
$75,293
6,245
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas