IAC logo
IAC Assessment: UU0240
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0240
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product NA
NAICS 621111 - Offices of Physicians (except Mental Health Specialists)
SIC 8011 - Offices & Clinics Of Medical Doctors
Sales <$500,000
# of Employees 200
Plant Area (Sq.Ft.) 130,000
Annual Production 1 Units
Production Hrs. Annual 3,640
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,904 2,695,040 kWh $0.04
Electricity Demand $97,834 6,010 kW-months/year $16.28
Electricity Fees $16,932 - $ -
Natural Gas $275,158 13,296 MMBtu $20.69
TOTAL ENERGY COSTS $486,828
RECOMMENDED SAVINGS* $14,455 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$10,047
Cost:
$10,320
$4,365 121,249 $5,682 349 - - $4,365
121,249
kWh
$5,682
349
kW-months/year
-
-
MMBtu
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,601
Cost:
$7,755
- - - - $1,601 77 -
-
kWh
-
-
kW-months/year
$1,601
77
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,286
Cost:
$1,500
$1,286 35,728 - - - - $1,286
35,728
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$977
Cost:
$113
$977 27,147 - - - - $977
27,147
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$544
Cost:
$1,387
$231 6,414 $313 19 - - $231
6,414
kWh
$313
19
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,455
Cost:
$21,075
$6,859 190,538 $5,995 368 $1,601 77 $6,859
190,538
kWh
$5,995
368
kW-months/year
$1,601
77
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas