IAC logo
IAC Assessment: UU0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Water Treatment and Irrigation
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 10
Plant Area (Sq.Ft.) 100,000
Annual Production 7,500,000 Thousand Gallons
Production Hrs. Annual 5,160
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,260 1,520,880 kWh $0.07
Electricity Demand $49,419 5,431 kW-months/year $9.10
Electricity Fees $13,111 - $ -
TOTAL ENERGY COSTS $163,790
RECOMMENDED SAVINGS* $523,483 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,358
Cost:
$5,447
$1,358 20,478 - - - - $1,358
20,478
kWh
-
-
kW-months/year
-
-
$
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$9,712
Cost:
$81,738
- - - - $9,712 - -
-
kWh
-
-
kW-months/year
$9,712
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$509,495
Cost:
$6,000,000
$509,495 7,604,400 - - - - $509,495
7,604,400
kWh
-
-
kW-months/year
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,472
Cost:
$2,250
- - $1,472 162 - - -
-
kWh
$1,472
162
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$264
Cost:
$504
$264 3,942 - - - - $264
3,942
kWh
-
-
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,182
Cost:
$5,868
$985 14,706 $197 22 - - $985
14,706
kWh
$197
22
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$523,483
Cost:
$6,095,807
$512,102 7,643,526 $1,669 183 $9,712 - $512,102
7,643,526
kWh
$1,669
183
kW-months/year
$9,712
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes