Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2025 |
Principal Product | Ceramic Substrates |
NAICS | 334419 - Other Electronic Component Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 39,229 |
Annual Production | 6,000,000 Units |
Production Hrs. Annual | 5,880 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $31,625 | 718,744 | kWh | $0.04 |
Electricity Demand | $38,896 | 2,307 | kW-months/year | $16.86 |
Electricity Fees | $22,088 | - | $ | - |
Natural Gas | $213,142 | 26,721 | MMBtu | $7.98 |
Other Gas | $46,454 | 3,718 | MMBtu | $12.49 |
TOTAL ENERGY COSTS | $352,205 | |||
RECOMMENDED SAVINGS* | $73,240 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION |
Savings: $12,361 Cost: $217,800 |
$7,086 | 157,471 | $6,130 | 364 | - | - | - | - | $(-855) | - |
$7,086 157,471 kWh |
$6,130 364 kW-months/year |
- - $ |
- - MMBtu |
$(-855) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $14,276 Cost: $180,000 |
$12,800 | 290,000 | $6,676 | 396 | - | - | - | - | $(-5,200) | - |
$12,800 290,000 kWh |
$6,676 396 kW-months/year |
- - $ |
- - MMBtu |
$(-5,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $24,314 Cost: $29,878 |
- | - | - | - | - | - | $24,314 | 3,048 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$24,314 3,048 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF |
Savings: $13,561 Cost: $178,488 |
$8,097 | 184,032 | $6,464 | 383 | - | - | - | - | $(-1,000) | - |
$8,097 184,032 kWh |
$6,464 383 kW-months/year |
- - $ |
- - MMBtu |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $762 Cost: $2,640 |
$301 | 6,694 | $461 | 27 | - | - | - | - | - | - |
$301 6,694 kWh |
$461 27 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $720 Cost: $1,680 |
$394 | 8,753 | $326 | 19 | - | - | - | - | - | - |
$394 8,753 kWh |
$326 19 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,117 Cost: $834 |
$1,219 | 27,706 | $898 | 53 | - | - | - | - | - | - |
$1,219 27,706 kWh |
$898 53 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,129 Cost: $12,300 |
- | - | - | - | $5,129 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,129 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $73,240 Cost: $623,620 |
$29,897 | 674,656 | $20,955 | 1,243 | $5,129 | - | $24,314 | 3,048 | $(-7,055) | - | $29,897 674,656 kWh |
$20,955 1,243 kW-months/year |
$5,129 - $ |
$24,314 3,048 MMBtu |
$(-7,055) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes |