Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2025 |
Principal Product | Machined parts |
NAICS | 332510 - Hardware Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 42,000 |
Annual Production | 1,500,000 Units |
Production Hrs. Annual | 7,488 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $61,096 | 1,697,100 | kWh | $0.04 |
Electricity Demand | $58,644 | 3,600 | kW-months/year | $16.29 |
Electricity Fees | $34,291 | - | $ | - |
Natural Gas | $39,870 | 3,962 | MMBtu | $10.06 |
TOTAL ENERGY COSTS | $193,901 | |||
RECOMMENDED SAVINGS* | $34,668 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,730 Cost: $6,750 |
- | - | $3,730 | 229 | - | - | - | - | - | - | - | - |
- - kWh |
$3,730 229 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $2,200 Cost: $6,000 |
- | - | - | - | $2,200 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,200 - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $6,322 Cost: $119,100 |
$4,792 | 133,115 | $2,948 | 181 | - | - | - | - | $(-1,419) | (-710) | - | - |
$4,792 133,115 kWh |
$2,948 181 kW-months/year |
- - $ |
- - MMBtu |
$(-1,419) (-710) Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,650 Cost: $9,727 |
- | - | - | - | - | - | $2,650 | 265 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,650 265 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,456 Cost: $3,600 |
$906 | 25,161 | $551 | 34 | - | - | - | - | - | - | - | - |
$906 25,161 kWh |
$551 34 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $3,113 Cost: $29,674 |
$1,924 | 53,436 | $1,189 | 73 | - | - | - | - | - | - | - | - |
$1,924 53,436 kWh |
$1,189 73 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1194 USE AUTOMATIC FLOW CONTROL |
Savings: $2,903 Cost: $6,218 |
$1,535 | 42,638 | $1,368 | 84 | - | - | - | - | - | - | - | - |
$1,535 42,638 kWh |
$1,368 84 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4145 USE MAGNETIC TECHNOLOGY TO TREAT WATER |
Savings: $12,294 Cost: $19,900 |
$(-530) | (-14,717) | $(-328) | (-20) | - | - | $24,144 | 2,400 | - | - | $(-10,992) | - |
$(-530) (-14,717) kWh |
$(-328) (-20) kW-months/year |
- - $ |
$24,144 2,400 MMBtu |
- - Tgal |
$(-10,992) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,668 Cost: $200,969 |
$8,627 | 239,633 | $9,458 | 581 | $2,200 | - | $26,794 | 2,665 | $(-1,419) | (-710) | $(-10,992) | - | $8,627 239,633 kWh |
$9,458 581 kW-months/year |
$2,200 - $ |
$26,794 2,665 MMBtu |
$(-1,419) (-710) Tgal |
$(-10,992) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Ancillary Material Cost |