IAC logo
IAC Assessment: UW0001
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0001
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2007
Principal Product Push/pull control cables
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 59,300
Annual Production 1 Units
Production Hrs. Annual 5,460
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,840 3,172,720 kWh $0.03
Electricity Demand $47,674 802 kW-months/year $59.44
Electricity Fees $7,373 - $ -
TOTAL ENERGY COSTS $168,751
RECOMMENDED SAVINGS* $23,977 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,324
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,324
Cost:
$10,082
$8,324 254,320 - - - - $8,324
254,320
kWh
-
-
kW-months/year
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,373
Cost:
$12,013
- - - - $7,373 - -
-
kWh
-
-
kW-months/year
$7,373
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,451
Cost:
$13,219
$3,504 107,070 $947 148 - - $3,504
107,070
kWh
$947
148
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,215
Cost:
$1,385
$846 25,779 $369 65 - - $846
25,779
kWh
$369
65
kW-months/year
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,052
Cost:
$1,291
$768 23,457 $284 50 - - $768
23,457
kWh
$284
50
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$880
Cost:
$1,900
$880 26,907 - - - - $880
26,907
kWh
-
-
kW-months/year
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$682
Cost:
$553
$491 15,008 $191 33 - - $491
15,008
kWh
$191
33
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$23,977
Cost:
$40,443
$14,813 452,541 $1,791 296 $7,373 - $14,813
452,541
kWh
$1,791
296
kW-months/year
$7,373
-
$
TOTAL IMPLEMENTED Savings:
$8,324
Cost:
$10,082
$8,324 254,320 - - - - $8,324
254,320
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees