IAC logo
IAC Assessment: UW0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2007
Principal Product Aluminum cans
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $50,000,000-$100,000,000
# of Employees 109
Plant Area (Sq.Ft.) 180,000
Annual Production 1,800,000,000 Pieces
Production Hrs. Annual 8,640
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,127,837 21,663,600 kWh $0.05
Electricity Demand $211,746 36,048 kW-months/year $5.87
Electricity Fees $11,416 - $ -
Natural Gas $866,333 78,076 MMBtu $11.10
TOTAL ENERGY COSTS $2,333,908
RECOMMENDED SAVINGS* $176,769 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,402
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$93,799
Cost:
$136,650
$81,034 1,460,071 $12,765 2,086 - - - - - - - - $81,034
1,460,071
kWh
$12,765
2,086
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$27,889
Cost:
$1,720
$28,640 516,031 $4,449 727 - - - - $(-5,200) - - - $28,640
516,031
kWh
$4,449
727
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-5,200)
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,369
Cost:
$138,420
$24,556 442,443 $3,813 623 - - - - - - - - $24,556
442,443
kWh
$3,813
623
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,031
Cost:
$7,140
$3,689 66,469 $557 91 - - $1,501 234,391 - - $2,284 - $3,689
66,469
kWh
$557
91
kW-months/year
-
-
MMBtu
$1,501
234,391
Tgal
-
-
$
$2,284
-
Tgal
05: 2.1117 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION Savings:
$11,196
Cost:
$2,080
$9,672 174,266 $1,524 249 - - - - - - - - $9,672
174,266
kWh
$1,524
249
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$4,114
Cost:
$3,000
- - - - $5,314 454 - - $(-1,200) - - - -
-
kWh
-
-
kW-months/year
$5,314
454
MMBtu
-
-
Tgal
$(-1,200)
-
$
-
-
Tgal
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,371
Cost:
$1,984
$2,960 53,327 $411 67 - - - - - - - - $2,960
53,327
kWh
$411
67
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$176,769
Cost:
$290,994
$150,551 2,712,607 $23,519 3,843 $5,314 454 $1,501 234,391 $(-6,400) - $2,284 - $150,551
2,712,607
kWh
$23,519
3,843
kW-months/year
$5,314
454
MMBtu
$1,501
234,391
Tgal
$(-6,400)
-
$
$2,284
-
Tgal
TOTAL IMPLEMENTED Savings:
$11,402
Cost:
$9,124
$6,649 119,796 $968 158 - - $1,501 234,391 - - $2,284 - $6,649
119,796
kWh
$968
158
kW-months/year
-
-
MMBtu
$1,501
234,391
Tgal
-
-
$
$2,284
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption