IAC Assessment: UW0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2008
Principal Product Fiber Reinforced Composites
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 82,000
Annual Production 50,000 Pieces
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,444 2,335,680 kWh $0.03
Electricity Demand $35,580 6,000 kW-months/year $5.93
Natural Gas $287,214 27,129 MMBtu $10.59
TOTAL ENERGY COSTS $399,238
RECOMMENDED SAVINGS* $142,437 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,231
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$115,054
Cost:
$172,581
$7,314 223,454 $1,816 35 $105,924 10,920 - - - - $7,314
223,454
kWh
$1,816
35
kW-months/year
$105,924
10,920
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,000
Cost:
$24,547
$12,760 389,869 $4,240 740 - - - - - - $12,760
389,869
kWh
$4,240
740
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$8,002
Cost:
$34,238
- - - - - - $3,338 67,500 $4,664 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,338
67,500
lb
$4,664
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,828
Cost:
$450
$1,828 55,861 - - - - - - - - $1,828
55,861
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$403
Cost:
$145
$346 6,169 $57 1 - - - - - - $346
6,169
kWh
$57
1
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$150
Cost:
$809
$150 4,587 - - - - - - - - $150
4,587
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$142,437
Cost:
$232,770
$22,398 679,940 $6,113 776 $105,924 10,920 $3,338 67,500 $4,664 - $22,398
679,940
kWh
$6,113
776
kW-months/year
$105,924
10,920
MMBtu
$3,338
67,500
lb
$4,664
-
$
TOTAL IMPLEMENTED Savings:
$2,231
Cost:
$595
$2,174 62,030 $57 1 - - - - - - $2,174
62,030
kWh
$57
1
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Primary Raw Material