IAC logo
IAC Assessment: UW0023
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2009
Principal Product Cereal Products
NAICS 311230 - Breakfast Cereal Manufacturing
SIC 2043 - Cereal Breakfast Foods
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 105,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,840 6,462,105 kWh $0.06
Electricity Demand $56,824 12,771 kW-months/year $4.45
Natural Gas $438,697 43,055 MMBtu $10.19
TOTAL ENERGY COSTS $1,040,733
RECOMMENDED SAVINGS* $56,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,092
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,974
Cost:
$120,000
$21,710 330,620 $2,264 453 - - $21,710
330,620
kWh
$2,264
453
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,851
Cost:
$2,500
$13,603 183,612 $1,248 20 - - $13,603
183,612
kWh
$1,248
20
kW-months/year
-
-
MMBtu
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$7,267
Cost:
$200,000
- - - - $7,267 727 -
-
kWh
-
-
kW-months/year
$7,267
727
MMBtu
04: 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS Savings:
$6,132
Cost:
-
- - - - $6,132 613 -
-
kWh
-
-
kW-months/year
$6,132
613
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,120
Cost:
$60,200
- - - - $4,120 432 -
-
kWh
-
-
kW-months/year
$4,120
432
MMBtu
TOTAL RECOMMENDED Savings:
$56,344
Cost:
$382,700
$35,313 514,232 $3,512 473 $17,519 1,772 $35,313
514,232
kWh
$3,512
473
kW-months/year
$17,519
1,772
MMBtu
TOTAL IMPLEMENTED Savings:
$46,092
Cost:
$322,500
$35,313 514,232 $3,512 473 $7,267 727 $35,313
514,232
kWh
$3,512
473
kW-months/year
$7,267
727
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu