IAC Assessment: UW0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2009
Principal Product Aerospace Composites
NAICS 336411 - Aircraft Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 140,000
Annual Production 13,000 Pieces
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,950 1,875,030 kWh $0.04
Electricity Demand $44,447 13,268 kW-months/year $3.35
TOTAL ENERGY COSTS $124,082
RECOMMENDED SAVINGS* $22,767 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,565
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes
$ kWh $ kW-months/year $ $ $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,517
Cost:
$48,000
$8,646 183,575 $1,262 377 $1,609 - - - - - $8,646
183,575
kWh
$1,262
377
kW-months/year
$1,609
-
$
-
-
Tgal
-
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$4,202
Cost:
$400
$(-9,702) - $13,904 - - - - - - - $(-9,702)
-
kWh
$13,904
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,586
Cost:
-
$2,857 79,365 $509 152 - - - - $(-780) - $2,857
79,365
kWh
$509
152
kW-months/year
-
-
$
-
-
Tgal
$(-780)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$889
Cost:
-
$754 20,947 $135 40 - - - - - - $754
20,947
kWh
$135
40
kW-months/year
-
-
$
-
-
Tgal
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$3,573
Cost:
-
- - - - - - $3,573 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,573
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$22,767
Cost:
$48,400
$2,555 283,887 $15,810 569 $1,609 - $3,573 - $(-780) - $2,555
283,887
kWh
$15,810
569
kW-months/year
$1,609
-
$
$3,573
-
Tgal
$(-780)
-
$
TOTAL IMPLEMENTED Savings:
$18,565
Cost:
$48,000
$12,257 283,887 $1,906 569 $1,609 - $3,573 - $(-780) - $12,257
283,887
kWh
$1,906
569
kW-months/year
$1,609
-
$
$3,573
-
Tgal
$(-780)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes