Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2009 |
Principal Product | Aerospace Composites |
NAICS | 336411 - Aircraft Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 13,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $70,950 | 1,875,030 | kWh | $0.04 |
Electricity Demand | $44,447 | 13,268 | kW-months/year | $3.35 |
TOTAL ENERGY COSTS | $124,082 | |||
RECOMMENDED SAVINGS* | $22,767 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,565 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,517 Cost: $48,000 |
$8,646 | 183,575 | $1,262 | 377 | $1,609 | - | - | - | - | - |
$8,646 183,575 kWh |
$1,262 377 kW-months/year |
$1,609 - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $4,202 Cost: $400 |
$(-9,702) | - | $13,904 | - | - | - | - | - | - | - |
$(-9,702) - kWh |
$13,904 - kW-months/year |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,586 Cost: - |
$2,857 | 79,365 | $509 | 152 | - | - | - | - | $(-780) | - |
$2,857 79,365 kWh |
$509 152 kW-months/year |
- - $ |
- - Tgal |
$(-780) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $889 Cost: - |
$754 | 20,947 | $135 | 40 | - | - | - | - | - | - |
$754 20,947 kWh |
$135 40 kW-months/year |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4151 MINIMIZE WATER USAGE |
Savings: $3,573 Cost: - |
- | - | - | - | - | - | $3,573 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$3,573 - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,767 Cost: $48,400 |
$2,555 | 283,887 | $15,810 | 569 | $1,609 | - | $3,573 | - | $(-780) | - | $2,555 283,887 kWh |
$15,810 569 kW-months/year |
$1,609 - $ |
$3,573 - Tgal |
$(-780) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,565 Cost: $48,000 |
$12,257 | 283,887 | $1,906 | 569 | $1,609 | - | $3,573 | - | $(-780) | - | $12,257 283,887 kWh |
$1,906 569 kW-months/year |
$1,609 - $ |
$3,573 - Tgal |
$(-780) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Administrative Changes |