IAC logo
IAC Assessment: UW0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2009
Principal Product Plastics Materials and Laminates
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 185,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,577 5,120,140 kWh $0.03
Electricity Demand $40,748 7,111 kW-months/year $5.73
Electricity Fees $552 - $ -
Natural Gas $1,459,353 131,000 MMBtu $11.14
TOTAL ENERGY COSTS $1,668,230
RECOMMENDED SAVINGS* $449,142 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$324,630
Cost:
$300,000
- - - - $324,630 29,141 -
-
kWh
-
-
kW-months/year
$324,630
29,141
MMBtu
02: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$93,152
Cost:
$13,100
- - - - $93,152 8,362 -
-
kWh
-
-
kW-months/year
$93,152
8,362
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,086
Cost:
$19,000
$11,262 344,085 $2,824 493 - - $11,262
344,085
kWh
$2,824
493
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,037
Cost:
-
$1,524 46,550 $513 7 - - $1,524
46,550
kWh
$513
7
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,715
Cost:
$200
$2,781 84,959 $934 163 - - $2,781
84,959
kWh
$934
163
kW-months/year
-
-
MMBtu
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,522
Cost:
$19,854
$8,966 273,966 $2,556 446 - - $8,966
273,966
kWh
$2,556
446
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$449,142
Cost:
$352,154
$24,533 749,560 $6,827 1,109 $417,782 37,503 $24,533
749,560
kWh
$6,827
1,109
kW-months/year
$417,782
37,503
MMBtu
TOTAL IMPLEMENTED Savings:
$31,360
Cost:
$39,054
$24,533 749,560 $6,827 1,109 - - $24,533
749,560
kWh
$6,827
1,109
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas