IAC logo
IAC Assessment: UW0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2009
Principal Product Sheet Metal Products
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 50,000 Pieces
Production Hrs. Annual 4,420
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,084 1,463,960 kWh $0.05
Natural Gas $37,836 2,825 MMBtu $13.39
TOTAL ENERGY COSTS $109,920
RECOMMENDED SAVINGS* $26,587 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,787
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,800
Cost:
$7,248
$650 13,009 - - $8,150 815 $650
13,009
kWh
-
-
kW-months/year
$8,150
815
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,782
Cost:
$31,747
$8,320 178,523 $462 50 - - $8,320
178,523
kWh
$462
50
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,643
Cost:
$10,000
$3,439 73,169 $204 198 - - $3,439
73,169
kWh
$204
198
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,065
Cost:
$3,070
$4,799 95,986 $266 260 - - $4,799
95,986
kWh
$266
260
kW-months/year
-
-
MMBtu
05: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$297
Cost:
$200
- - - - $297 30 -
-
kWh
-
-
kW-months/year
$297
30
MMBtu
TOTAL RECOMMENDED Savings:
$26,587
Cost:
$52,265
$17,208 360,687 $932 508 $8,447 845 $17,208
360,687
kWh
$932
508
kW-months/year
$8,447
845
MMBtu
TOTAL IMPLEMENTED Savings:
$17,787
Cost:
$45,017
$16,558 347,678 $932 508 $297 30 $16,558
347,678
kWh
$932
508
kW-months/year
$297
30
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas