IAC logo
IAC Assessment: UW0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2011
Principal Product Natural Gas
NAICS 486110 - Pipeline Transportation of Crude Oil
SIC 4612 - Crude Petroleum Pipelines
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 40,000
Annual Production 500 Thousand Feet
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $258,980 7,713,600 kWh $0.03
Electricity Demand $3,505 881 kW-months/year $3.98
TOTAL ENERGY COSTS $262,485
RECOMMENDED SAVINGS* $65,998 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,819
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,217
Cost:
$80,000
$26,665 726,590 $9,552 2,412 $26,665
726,590
kWh
$9,552
2,412
kW-months/year
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,962
Cost:
$29,807
$14,768 402,525 $2,194 552 $14,768
402,525
kWh
$2,194
552
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,680
Cost:
$10,004
$5,317 144,746 $3,363 845 $5,317
144,746
kWh
$3,363
845
kW-months/year
04: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$4,139
Cost:
$2,295
$2,258 68,429 $1,881 475 $2,258
68,429
kWh
$1,881
475
kW-months/year
TOTAL RECOMMENDED Savings:
$65,998
Cost:
$122,106
$49,008 1,342,290 $16,990 4,284 $49,008
1,342,290
kWh
$16,990
4,284
kW-months/year
TOTAL IMPLEMENTED Savings:
$12,819
Cost:
$12,299
$7,575 213,175 $5,244 1,320 $7,575
213,175
kWh
$5,244
1,320
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand