IAC Assessment: UW2317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product Warm Mix and Hot Mix Asphalt
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 13
Plant Area (Sq.Ft.) 6,065
Annual Production 250,000 Tons
Production Hrs. Annual 2,904
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,886 715,977 kWh $0.09
Electricity Demand $18,224 3,672 kW-months/year $4.96
Electricity Fees $13,097 - $ -
Natural Gas $244,371 40,379 MMBtu $6.05
TOTAL ENERGY COSTS $336,578
RECOMMENDED SAVINGS* $63,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,207
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$533
Cost:
-
$410 4,823 $123 25 - - $410
4,823
kWh
$123
25
kW-months/year
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$658
Cost:
$1,096
$658 7,739 - - - - $658
7,739
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$156
Cost:
$1,901
$142 1,647 $14 3 - - $142
1,647
kWh
$14
3
kW-months/year
-
-
MMBtu
04: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$31,756
Cost:
$1,000,000
- - - - $31,756 5,249 -
-
kWh
-
-
kW-months/year
$31,756
5,249
MMBtu
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$30,104
Cost:
$300,000
- - - - $30,104 5,051 -
-
kWh
-
-
kW-months/year
$30,104
5,051
MMBtu
TOTAL RECOMMENDED Savings:
$63,207
Cost:
$1,302,997
$1,210 14,209 $137 28 $61,860 10,300 $1,210
14,209
kWh
$137
28
kW-months/year
$61,860
10,300
MMBtu
TOTAL IMPLEMENTED Savings:
$63,207
Cost:
$1,302,997
$1,210 14,209 $137 28 $61,860 10,300 $1,210
14,209
kWh
$137
28
kW-months/year
$61,860
10,300
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas