IAC logo
IAC Assessment: WI0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1987
Principal Product SHAPED WIRE
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 40,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $302,425 5,788,101 kWh $0.05
Natural Gas $48,513 9,795 MMBtu $4.95
TOTAL ENERGY COSTS $350,938
RECOMMENDED SAVINGS* $45,783 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,108
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$23,501
Cost:
-
$23,501 449,883 - - - - $23,501
449,883
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$13,151
Cost:
-
$13,151 251,759 - - - - $13,151
251,759
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,974
Cost:
$4,177
$5,974 114,302 - - - - $5,974
114,302
kWh
-
-
MMBtu
-
-
$
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$265
Cost:
-
$265 - - - - - $265
-
kWh
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$983
Cost:
$500
- - $1,083 219 $(-100) - -
-
kWh
$1,083
219
MMBtu
$(-100)
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,909
Cost:
$750
- - $1,909 386 - - -
-
kWh
$1,909
386
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,783
Cost:
$5,427
$42,891 815,944 $2,992 605 $(-100) - $42,891
815,944
kWh
$2,992
605
MMBtu
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$20,108
Cost:
$4,677
$19,125 366,061 $1,083 219 $(-100) - $19,125
366,061
kWh
$1,083
219
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes