IAC logo
IAC Assessment: WI0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1988
Principal Product SEATS FOR MASS TRANSIT
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,900
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,323 776,964 kWh $0.07
Other Energy $37,149 6,687 MMBtu $5.56
TOTAL ENERGY COSTS $92,472
RECOMMENDED SAVINGS* $12,584 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,591
#|Description Savings
Cost
Status Electricity Usage Other Energy Electricity Usage Other Energy
$ kWh $ MMBtu
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$515
Cost:
-
$515 7,327 - - $515
7,327
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$258
Cost:
-
$258 3,517 - - $258
3,517
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,989
Cost:
$4,059
$6,989 101,407 - - $6,989
101,407
kWh
-
-
MMBtu
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$818
Cost:
-
$818 11,430 - - $818
11,430
kWh
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,004
Cost:
$2,800
- - $4,004 720 -
-
kWh
$4,004
720
MMBtu
TOTAL RECOMMENDED Savings:
$12,584
Cost:
$6,859
$8,580 123,681 $4,004 720 $8,580
123,681
kWh
$4,004
720
MMBtu
TOTAL IMPLEMENTED Savings:
$1,591
Cost:
-
$1,591 22,274 - - $1,591
22,274
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Other Energy Electricity Usage Other Energy