IAC logo
IAC Assessment: WI0028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1988
Principal Product SHEET METAL ASSEMBLIES
NAICS n/a
SIC 3524 - Lawn And Garden Equipment
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,626 4,379,543 kWh $0.05
Natural Gas $93,794 27,326 MMBtu $3.43
TOTAL ENERGY COSTS $316,420
RECOMMENDED SAVINGS* $23,709 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,649
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$11,017
Cost:
-
$11,017 216,589 - - - - $11,017
216,589
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,745
Cost:
-
$2,745 53,927 - - - - $2,745
53,927
kWh
-
-
MMBtu
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,249
Cost:
-
$1,249 20,223 - - - - $1,249
20,223
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,774
Cost:
$1,200
- - $5,774 1,684 - - -
-
kWh
$5,774
1,684
MMBtu
-
-
$
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$319
Cost:
-
$279 5,569 $40 12 - - $279
5,569
kWh
$40
12
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,060
Cost:
-
$2,030 - - - $(-970) - $2,030
-
kWh
-
-
MMBtu
$(-970)
-
$
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,545
Cost:
$5,000
$1,545 30,481 - - - - $1,545
30,481
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,709
Cost:
$6,200
$18,865 326,789 $5,814 1,696 $(-970) - $18,865
326,789
kWh
$5,814
1,696
MMBtu
$(-970)
-
$
TOTAL IMPLEMENTED Savings:
$22,649
Cost:
$6,200
$16,835 326,789 $5,814 1,696 - - $16,835
326,789
kWh
$5,814
1,696
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes