IAC logo
IAC Assessment: WI0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1988
Principal Product COMPRESSED GAS CYLINDERS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 132
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Pieces
Production Hrs. Annual 4,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $306,097 4,769,050 kWh $0.06
Natural Gas $336,070 112,975 MMBtu $2.97
TOTAL ENERGY COSTS $642,167
RECOMMENDED SAVINGS* $47,285 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,456
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$31,106
Cost:
-
$31,106 484,760 - - - - $31,106
484,760
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,304
Cost:
-
$1,304 20,223 - - - - $1,304
20,223
kWh
-
-
MMBtu
-
-
$
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$912
Cost:
-
$912 - - - - - $912
-
kWh
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,240
Cost:
-
$4,080 - - - $(-840) - $4,080
-
kWh
-
-
MMBtu
$(-840)
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,542
Cost:
$3,000
- - $5,542 1,866 - - -
-
kWh
$5,542
1,866
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,181
Cost:
$500
- - $5,481 1,845 $(-300) - -
-
kWh
$5,481
1,845
MMBtu
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$47,285
Cost:
$3,500
$37,402 504,983 $11,023 3,711 $(-1,140) - $37,402
504,983
kWh
$11,023
3,711
MMBtu
$(-1,140)
-
$
TOTAL IMPLEMENTED Savings:
$5,456
Cost:
-
$6,296 20,223 - - $(-840) - $6,296
20,223
kWh
-
-
MMBtu
$(-840)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes