IAC Assessment: WI0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1989
Principal Product ROLLERS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,108 1,859,027 kWh $0.06
Natural Gas $39,017 9,174 MMBtu $4.25
TOTAL ENERGY COSTS $154,125
RECOMMENDED SAVINGS* $20,864 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,028
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,210
Cost:
$500
$3,210 51,876 - - - - $3,210
51,876
kWh
-
-
MMBtu
-
-
$
02: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$3,901
Cost:
$1,300
$3,080 49,824 $821 193 - - $3,080
49,824
kWh
$821
193
MMBtu
-
-
$
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$238
Cost:
-
$238 - - - - - $238
-
kWh
-
-
MMBtu
-
-
$
04: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$1,836
Cost:
-
$2,436 - - - $(-600) - $2,436
-
kWh
-
-
MMBtu
$(-600)
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,913
Cost:
$3,600
$11,001 60,082 $(-1,088) (-256) - - $11,001
60,082
kWh
$(-1,088)
(-256)
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,766
Cost:
$2,100
- - $1,766 415 - - -
-
kWh
$1,766
415
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,864
Cost:
$7,500
$19,965 161,782 $1,499 352 $(-600) - $19,965
161,782
kWh
$1,499
352
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$19,028
Cost:
$7,500
$17,529 161,782 $1,499 352 - - $17,529
161,782
kWh
$1,499
352
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes