Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1989 |
Principal Product | ALUMINUM & ZINC CASTINGS |
NAICS | n/a |
SIC | 3364 - Nonferrous Die-casting Exc. Aluminum |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 19,800 Pounds |
Production Hrs. Annual | 6,600 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $241,569 | 5,429,953 | kWh | $0.04 |
Natural Gas | $188,941 | 55,978 | MMBtu | $3.38 |
TOTAL ENERGY COSTS | $430,510 | |||
RECOMMENDED SAVINGS* | $90,964 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $84,738 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $68,209 Cost: $80,000 |
$100,938 | 2,270,223 | $(-32,729) | (-9,683) | - | - |
$100,938 2,270,223 kWh |
$(-32,729) (-9,683) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $12,776 Cost: $15,000 |
- | - | $(-14,724) | (-4,356) | $27,500 | - |
- - kWh |
$(-14,724) (-4,356) MMBtu |
$27,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $2,689 Cost: $6,820 |
- | - | $2,689 | 796 | - | - |
- - kWh |
$2,689 796 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $577 Cost: $500 |
- | - | $627 | 186 | $(-50) | - |
- - kWh |
$627 186 MMBtu |
$(-50) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $487 Cost: $1,000 |
$487 | - | - | - | - | - |
$487 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $6,226 Cost: - |
$6,226 | 140,094 | - | - | - | - |
$6,226 140,094 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $90,964 Cost: $103,320 |
$107,651 | 2,410,317 | $(-44,137) | (-13,057) | $27,450 | - | $107,651 2,410,317 kWh |
$(-44,137) (-13,057) MMBtu |
$27,450 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $84,738 Cost: $103,320 |
$101,425 | 2,270,223 | $(-44,137) | (-13,057) | $27,450 | - | $101,425 2,270,223 kWh |
$(-44,137) (-13,057) MMBtu |
$27,450 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |