IAC Assessment: WI0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1990
Principal Product PRECISION MACHINING
NAICS n/a
SIC 3451 - Screw Machine Products
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 5,500
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,192 2,726,260 kWh $0.08
Natural Gas $17,075 3,897 MMBtu $4.38
TOTAL ENERGY COSTS $228,267
RECOMMENDED SAVINGS* $26,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,226
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$6,079
Cost:
-
$6,079 78,546 - - $6,079
78,546
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,874
Cost:
$6,425
$4,874 63,013 - - $4,874
63,013
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,560
Cost:
$3,018
$5,560 71,805 - - $5,560
71,805
kWh
-
-
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,297
Cost:
$1,600
$2,297 29,601 - - $2,297
29,601
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,501
Cost:
$1,500
- - $1,501 343 -
-
kWh
$1,501
343
MMBtu
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,366
Cost:
$4,800
$1,366 17,585 - - $1,366
17,585
kWh
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,255
Cost:
$1,000
$1,255 16,120 - - $1,255
16,120
kWh
-
-
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,027
Cost:
-
$1,027 13,189 - - $1,027
13,189
kWh
-
-
MMBtu
09: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$370
Cost:
-
$370 4,689 - - $370
4,689
kWh
-
-
MMBtu
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,991
Cost:
$520
- - $1,991 455 -
-
kWh
$1,991
455
MMBtu
TOTAL RECOMMENDED Savings:
$26,320
Cost:
$18,863
$22,828 294,548 $3,492 798 $22,828
294,548
kWh
$3,492
798
MMBtu
TOTAL IMPLEMENTED Savings:
$15,226
Cost:
$7,945
$13,235 170,868 $1,991 455 $13,235
170,868
kWh
$1,991
455
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas